Q#1 GATE CH 2013 MCQ +2 marks -0.66 marks

In a factory, two machines M1 and M2 manufacture 60% and 40% of the autocomponents respectively. Out of the total production, 2% of M1 and 3% of M2 are found to be defective. If a randomly drawn autocomponent from the combined lot is found defective, what is the probability that it was manufactured by M2?

0.35

0.45

0.5

0.4

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Chemical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Heat Transfer 26 0 0
Chemical Technology 17 0 0
Mechanical Operations 12 0 0
Mass Transfer 42 0 0
Instrumentation and Process Control 26 0 0
Fluid Mechanics 24 0 0
Engineering Mathematics 41 0 0
General Aptitude 60 0 0
Chemical Reaction Engineering 26 0 0
Process Calculation 9 0 0
Plant Design Economics 10 0 0
Thermodynamics 24 0 0