Loading...

Loading, please wait...

GATE trinity
Learning Tool
Prep plan My packages

Practice over 1000+ GATE-level questions from this topic!

Designed to match the latest GATE pattern with topic-wise precision, difficulty tagging, and detailed solutions.

Q#1 GATE CH 2012 MCQ +2 marks -0.66 marks

An automobile plant contracted to buy shock absorbers from two suppliers X and Y. X supplies 60% and Y supplies 40% of the shock absorbers. All shock absorbers are subjected to a quality test. The ones that pass the quality test are considered reliable. Of X's shock absorbers,  are reliable. Of Y's shock absorbers, 72% are reliable.
The probability that a randomly chosen shock absorber, which is found to be reliable, is made by Y is

0.288

0.334

0.667

0.720

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Chemical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Heat Transfer 26 0 0
Chemical Technology 17 0 0
Mechanical Operations 12 0 0
Mass Transfer 42 0 0
Instrumentation and Process Control 26 0 0
Fluid Mechanics 24 0 0
Engineering Mathematics 41 0 0
General Aptitude 60 0 0
Chemical Reaction Engineering 26 0 0
Process Calculation 9 0 0
Plant Design Economics 10 0 0
Thermodynamics 24 0 0